Concrete province-wide across New Brunswick · Framing within 45 minutes of Fredericton
WorkSafeNB registered506 206 9636
JACE CONSTRUCTIONCONCRETE + FRAMING
Capabilities & equipment

The equipment, the tolerances and the pour size — published.

What we own, what we can hold and how much we can put down in a day. This is the page an estimator opens before deciding whether to send us drawings.

St. Andrews — formwork for twelve-foot walls, half again a standard basement
  • On siteMay to September 2025
  • ScopeFoundations & footings
Why this page exists

Most subcontractors make you phone to find this out.

An estimator sizing a bid list needs three numbers: what you can place, how flat you can finish it and how much you can pour in a day. Publishing them saves both of us a call.

Crew size
00
Concrete division
Largest continuous pour
000
In a single day
Achievable tolerance
FF00/ FL00
To spec
Placing season
MAR–DEC
Cold-weather placement available
Equipment

Placement and finishing plant

Owned unless noted otherwise.

ItemDetailNotes
Ride-on power trowelPlaceholderConfirm count and model
Walk-behind power trowelPlaceholderConfirm count
Laser screedPlaceholder — timeline TBCGrowth equipment; confirm arrival date
Concrete pump accessPlaceholderOwned or hired — confirm
Concrete buggiesPlaceholderConfirm count
Vibratory screedsPlaceholderConfirm count
Laser level / total stationPlaceholderUsed to set and verify falls
Saw-cutting equipmentPlaceholderEarly-entry or wet-cut — confirm
Forming systemModular panel formsConfirm system and panel inventory
Heating and hoardingPlaceholderCold-weather placement
Compaction plantPlaceholderConfirm
Site transportPlaceholderTrucks and trailers

Every row on this page is a placeholder until confirmed with Jon. The laser screed and ride-on trowel headline this page the week they land — that is the point of publishing the list at all.

Tolerances

What we can hold, and how it gets measured

MeasureCapabilityNotes
Overall floor flatness (FF)FF00Placeholder — confirm achievable number
Overall floor levelness (FL)FL00Placeholder
Local flatnessPlaceholderPlaceholder
Measurement methodPlaceholderConfirm whether JACE measures or a third party does
Straightedge tolerancePlaceholderPlaceholder
Foundation wall plumbPlaceholderPlaceholder
Capacity

How much, how far, how soon

MeasureCapabilityNotes
Maximum continuous pour000 m³ in a single dayPlaceholder
Typical daily placement000 m³Placeholder
Concrete crew size00Placeholder
Crews available at once0Placeholder
Placing seasonMarch – DecemberCold-weather placement available
Mobilisation radiusAll of New BrunswickMobilisation cost stated in the bid
Lead time from awardPlaceholderPlaceholder
Capabilities

Need something not on this list?

Ask. If we can't self-perform it we'll say so rather than price around it.

Invite JACE to Bid