Prototype builds where the opening date is already advertised.
Franchise and prototype retail packages come with a fixed opening date and a drawing set that changes late. Both are schedule problems, and both are managed the same way: one crew, and a change-order process that doesn't stop the work.
Why a franchise build is a different job
A prototype package is not designed for your site. The drawings arrive substantially complete, the changes arrive later, and the opening date was set before anyone broke ground.
What a GC needs from the framer on that job is not the lowest number. It is a subcontractor who prices the scope as drawn, flags the conflicts early, prices the change without stopping, and does not use the revision as a reason the date moved.
- Scope priced as drawn, with exclusions stated at bid
- Drawing conflicts flagged in review, not discovered on site
- Changes priced and carried on without downing tools
- Opening date treated as the fixed constraint it is
Franchise build capability
Placeholders until confirmed.
| Item | Capability | Notes |
|---|---|---|
| Building types | Placeholder | Confirm which franchise brands can be named |
| Typical build duration | Placeholder | Placeholder |
| Framing system | Placeholder | Wood frame |
| Change-order turnaround | Placeholder | Placeholder |
| Crew size | 00 | Placeholder |
| Winter framing | Placeholder | Confirm |
Every value in this table is a placeholder until confirmed. Nothing here is published as a capability claim before Jon signs off on the number.
What one crew can carry
Scheduling detail is on the capacity page.
Projects in this scope
Square footage, spec and schedule on every one — the detail an estimator actually needs.

Restaurant slab and foundations on a live retail site
Footings, frost walls, column piers and the building slab for a Swiss Chalet in Saint John, placed and finished on a working retail lot through summer 2026.
Read the case study
Tim Hortons framed in three weeks flat
Commercial framing for a 2,200 sq ft Tim Hortons on Nevers Road, contracted directly by Simpson Building Contractors and framed between 16 July and 7 August 2026.
Read the case studySend us a prototype package to price
Drawings, the opening date and a bid date is enough to get started.