Concrete province-wide across New Brunswick · Framing within 45 minutes of Fredericton
WorkSafeNB registered506 206 9636
JACE CONSTRUCTIONCONCRETE + FRAMING
Foundations & footings

Footings, frost walls and formed foundations for commercial and multi-unit builds.

Cast-in-place walls on strip footings, grade beams, engineered slabs and piers — sequenced so the frame can start the week the walls are backfilled.

Saint John — foundation walls across the footprint of an 18-unit block
  • CompletedSeptember 2025
  • ScopeFoundations & footings
The scope

What a foundation package from JACE covers

Excavation handover check, strip footings and pads, formed walls with a modular panel system, grade beams and interior bearing walls poured in the same package where the drawings allow, tie holes plugged and damp-proofed, and the wall released for backfill on a stated date.

On multi-unit work the foundation package and the framing package can come from the same company — one number, one schedule, no gap between the two trades.

  • Footings and walls priced as one package, not two mobilisations
  • Interior bearing walls and grade beams poured with the perimeter where drawings allow
  • Tie holes plugged and damp-proofed before backfill, every time
  • Release date for backfill stated in the bid, not negotiated afterwards
Specification

Foundation specification — what we can hold

Placeholders until confirmed. Nothing here is published as a capability claim.

ItemCapabilityNotes
Forming systemModular panel formsPlaceholder — confirm system and supplier
Maximum wall height00 ftPlaceholder
Footing typesStrip, pad, steppedPlaceholder
Grade beamsPlaceholderPoured with perimeter where drawings allow
ICFPlaceholderConfirm whether JACE self-performs ICF
Concrete strength00–00 MPaPlaceholder
Damp-proofingPlaceholderApplied before backfill
Maximum continuous pour000 m³ in a single dayPlaceholder
Placing seasonMarch – DecemberCold-weather placement available

Every value in this table is a placeholder until confirmed. Nothing here is published as a capability claim before Jon signs off on the number.

Capability snapshot

What we can put on the ground

The full equipment list is on the capabilities page.

Crew size
00
Concrete division
Largest continuous pour
000
In a single day
Projects completed
100+
Concrete and framing
Placing season
MAR–DEC
Cold-weather placement available
Foundations

Send us a foundation to price

Drawings, the excavation date and a bid date is enough to get started.

Invite JACE to Bid