Everything you need to decide whether to add us to the bid list.
Scope, capability, project proof and qualification details, published — so an estimator can qualify us without a phone call.
Everything you need to decide whether to add us to the bid list.
Scope, capability, project proof and qualification details, published — so an estimator can qualify us without a phone call.
Registered and in good standingClearance letter available on requestWe bid as a subcontractor. Always.
JACE does not act as general contractor and does not carry other trades. That removes the question before it gets asked.
- Drawings and specification, or the relevant sections
- The bid close date
- Site address and expected start window
- Anything unusual about access, sequencing or site conditions
- A number priced on the scope as drawn
- A written list of exclusions — no assumptions left implied
- A start date and a finish date we will hold
- Named contact for the duration of the job
Two pages, no financials, sendable inside a bid package
What an estimator actually wants at the qualifying stage. It costs nothing to give away, so it is an open download.
| Section | Contents |
|---|---|
| Company overview | Legal name, structure, year established, ownership, offices |
| Trade scope by division | What is included in our number and what is by others |
| Coverage and mobilisation | Where we bid, and what mobilisation costs on a small job |
| Equipment list | Placement and finishing plant, owned versus hired |
| Achievable tolerances | Flatness and levelness, and how they get measured |
| Crew size and capacity | Per division, plus maximum continuous pour |
| Project list | Recent and similar projects with values |
| Credential summary | WorkSafeNB standing and any certifications held |
Placeholder link — the capability sheet gets built once the equipment list, tolerances and project list are confirmed. Nothing on it should be a number that isn’t on this site.
The full package, one general contractor at a time
A prequalification package contains financial statements, so it is not a public download. Ask and it comes to you directly — in your portal’s format or on CCDC 11.
| Document | Notes |
|---|---|
| CCDC 11 Contractor’s Qualification Statement | The Canadian standard form; completed on request |
| Bonding letter | From the surety, dated within 30 days, with single-project and aggregate capacity |
| Certificate of insurance | GL, auto and umbrella, with additional-insured endorsement |
| Financial statements | Third-party prepared, plus WIP schedule and AR aging |
| Safety record | Three years of incident statistics and the safety manual |
| WorkSafeNB clearance letter | Confirms the account is in good standing |
| References | Owner and consultant contacts, with permission |
We submit through yours
BuildingConnected / TradeTapp, iSqFt and CMiC — files supplied separately rather than as one locked PDF.
WorkSafeNB in good standing
Clearance letter on request, so your account is never exposed to unpaid premiums.
Placeholder
Placeholder — how quickly a completed prequalification package can be returned.
Send the drawings, the scope and a bid date
We’ll route it straight to the right division and come back with a number.
