ConcreteFoundations & footings

Cast-in-place cores and stairs on a 160,000 sq ft complex

Structural concrete on a 160,000 sq ft apartment complex in southside Fredericton for Gorham Real Estate — footings, walls and poured-in-place stair flights, August 2025 to May 2026.

ClientGorham Real Estate
LocationFredericton, NB
Our roleSubcontractor
Aerial view of the Serenity Lane apartment complex with the concrete cores in place and framing underway
Cast-in-place concrete stair flight inside a finished core
Tied rebar standing in the wall formwork before the pour
Formed and tied footing running along the building line
Aerial view of the complex in context with the surrounding development
Cranes working over the long concrete wall run

Aerial view of the Serenity Lane apartment complex with the concrete cores in place and framing underway

01 / 06
The job

Ten months on one site through a full New Brunswick winter, with the concrete cores setting the pace for every trade behind them.

  1. 01 — What was asked for

    Gorham Real Estate needed the structural concrete on a 160,000 square foot apartment complex in southside Fredericton — footings and walls, and the cast-in-place stair and shaft cores that the rest of the building hangs off.

  2. 02 — What we did

    The crew ran from August 2025 to May 2026. Footings were formed and tied on grade, walls poured in braced formwork, and the stair flights cast in place inside the finished cores rather than set as precast.

    • Footings, walls and cores on a 160,000 sq ft complex
    • Stair flights cast in place inside the cores
    • Ten months on one site, straight through the winter
  3. 03 — How it finished

    Structural concrete complete May 2026.