ConcreteFoundations & footings
Workshop foundation poured through a New Brunswick January
155 m³ of 25 MPa concrete in seven-foot walls for a 6,500 sq ft workshop, formed and placed in winter conditions and finished in January 2025.
ClientConfidential — reference on request
LocationCambridge, NB
Our roleSubcontractor


The job
A January pour on an open site with snow on the ground from the first footing to the last wall.
- 01 — What was asked for
A 6,500 square foot workshop needed its structural concrete: footings and seven-foot walls, on an exposed site, in the middle of winter.
- 02 — What we did
The crew formed and placed 155 m³ of 25 MPa concrete in seven-foot walls with snow on the ground throughout. The forming ran off a telehandler working from the plowed perimeter.
- 155 m³ placed in winter conditions
- Seven-foot walls formed on an exposed site
- Work kept moving through the January weather
- 03 — How it finished
Structural concrete complete January 2025.